Haigh Rail completes Points Upgrade Works in Manchester

Haigh Rail’s Track Division, led by Engineering Director Dan Foster, has supported and assisted Network Rail with some points upgrade works at Phillips Park in Manchester.

The scope included replacement of timbers, ironwork, squaring points and regauging.

The project commenced on Friday 8th March 2023 and was handed back on time, successfully on 13th March 2023.

Great work from our track team.

Our Track Division is an established multi-disciplinary track renewal and maintenance service provider that delivers permanent way projects covering renewals, maintenance and engineering services. These are the services delivered:

  • S&C Plain Lining and New Track Installation
  • Hollow Bearer Installation
  • Plain Line Installation
  • Point Condition Surveys
  • IBJ (Insulated Block Joints) and HB Surveys (Hollow bearer)
  • IBJ Installation and Recovery
  • Stressing/Tamping/Handback Works
  • Track Monitoring

These activities are supported by our in house Welding Division.

Share:

Head Office

39 & 40 Momentum Place
Off Nook Lane
Bamber Bridge
Preston
Lancashire
PR5 6EF

01772 458000
info@haighrail.com

South Yorkshire Office

The Old Dairy
Tranmoor Lane
Armthorpe
Doncaster
South Yorkshire
DN3 3BS

01302 342188
info@haighrail.com

Crewe Office

Unit 104
The Courtyard
Radway Green Business Park
Crewe
CW2 5PR

01270 446595
keiran@haighresourcing.com